Indagini sismiche Yerevan Power Plant – ARMENIA

The specific purpose of the investigation was to reconstruct the seismostratigraphic sequence in order to characterize soils involved in the Power Plant project. The investigations have been performed recording a n.3 seismic lines (L1-L2-L3) by energization in P-waves and S-waves with tomographic processing, for a total length of 575 meters. On the L1 seismic array […]